Mukhyamantri Saur Swarojgar Yojana - Uttarakhand Renewable Energy Development Agency

Key Features

Financial Assistance

Component

Assistance Provided

Detailed Explanation

Solar Plant Capacity

Typically 20 kW to 200 kW

Size of plant allocated based on eligibility and land availability. Example: A 100 kW plant generates steady monthly income.

Capital Investment

Beneficiary + bank loan

Project cost is generally financed through loans and own contribution.

Subsidy Support

As per renewable energy norms

Subsidy may be available under central/state renewable schemes. (Needs confirmation from latest guidelines)

Power Purchase

Assured by DISCOM

Electricity generated is purchased at predefined tariff.

Income Generation

Based on generation capacity

Example: 100 kW plant can generate consistent annual revenue based on tariff rates.

Eligibility Criteria

  1. Applicant must be a resident of Uttarakhand
  2. Must be unemployed youth, farmer, or individual entrepreneur
  3. Must own or have access to suitable land (generally barren/non-agricultural)
  4. Age typically 18 years and above
  5. Must be willing to set up solar power project
  6. Must comply with UREDA and DISCOM guidelines

Non-eligibility conditions:

Documents Required

Application Process

Option 1: Apply with Bullit, Recommended

Start instantly with our guided application support, where our team verifies eligibility, prepares documentation, and coordinates with the Industries Department on your behalf. Using our business loans and compliance calendar, you can track progress while focusing on project execution, we manage the application end-to-end.

Option 2: Apply Online / Offline (Government Process)

  1. Visit official UREDA/MSYY portal
  2. Register as applicant
  3. Fill application form with land and personal details
  4. Upload required documents
  5. Submit application
  6. Technical feasibility assessment is conducted
  7. Project capacity is allotted
  8. Sign agreement with DISCOM
  9. Install plant and start power generation