Key Features

Financial Assistance

Component

Assistance Provided

Detailed Explanation

Power Tariff Reimbursement

INR 1.00 per unit  of power consumed by the unit

Example: Suppose your approved ESDM manufacturing unit consumes 5 million kWh in the first year of commercial production. At INR 1 per unit, you could claim a reimbursement of INR 5 million (₹ 50 lakh) for that year under this incentive.

Duration

For 5 years from commencement of commercial production

The reimbursement applies for each of the first five years - subject to verification and eligibility criteria.

Base year/Incremental usage 

For expansions of existing units, only incremental power consumption above the base year counts

Example: An existing unit’s base year consumption was 3 million kWh; after expansion it consumes 4.5 million kWh. The incremental 1.5 million kWh would qualify for INR 1 per unit reimbursement. 

Eligibility Criteria

Who Can Apply:

Who Cannot Apply:

Documents Required

Application Process for the Scheme

Option 1: Apply with Bullit 

Click here to start with guided support. Our team verifies eligibility, compiles documents, and handles application & follow-ups on your behalf. You can monitor progress while focusing on operations. 
Recommended for: Manufacturing units seeking to streamline the reimbursement claim and expedite benefit realisation.

Option 2: Via KITS / Single Window Portal

  1. Register your project under the Special Incentives Scheme for ESDM Sector 2020-25 via KITS and obtain “in-principle” sanction for incentives.
  2. Commence commercial production and ensure meter/billing records reflect your power consumption.
  3. Fill out the application form  for Power Tariff Reimbursement along with required production/power consumption data.
  4. Submit documentation including power bills, signed undertakings, unit start date, etc as per guidelines.
  5. Upon verification by KITS and submission of required bank guarantee or undertaking, the reimbursement is sanctioned and disbursed.

Option 3: Via Utility / Power Distribution Company Support

  1. Coordinate with your electricity supply agency  to obtain separate meter/documentation for the new unit or expansion .
  2. Maintain timely and accurate power consumption records to ensure smooth reimbursement claims.
  3. Work with KITS to align power bills and claim submissions.